Description This module will provide an overview of the technical and managerial challenges associated with the design and construction of a modern biopharmaceutical manufacturing facility. It will address the major components of such an exercise including site planning through conceptual and detailed design and on to commissioning, start-up and validation. A typical case study illustrating the integrated approach to facility design will also be considered. Attention will be given to the day-to-day operation of a biopharmaceutical facility operating in a regulated environment. Following facility construction, issues such as materials flow, personnel flow and some general utilities necessary for successful production will also be discussed. | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Learning Outcomes 1. Effectively plan the major elements of an investment in a biopharmaceutical manufacturing facility. 2. Demonstrate an understanding of the complex interconnecting elements of these major capital projects. 3. Address the operational requirements for the manufacturing facility within the design. | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
All module information is indicative and subject to change. For further information,students are advised to refer to the University's Marks and Standards and Programme Specific Regulations at: http://www.dcu.ie/registry/examinations/index.shtml |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Indicative Content and Learning Activities
Introduction to Biomanufacturing with respect to Facility Design Facility Design Issues – A Regulatory Perspective Site Selection, Conceptual Design, Site Master Planning Facility Design Facility Construction Facility Equipping, Start-up and Validation Cleanroom Design and HVAC Technology Utilities; Water, Gas, Steam, Air GMP Facility: day to day operation (personnel, materials & waste flows) Environmental monitoring, theory and practice New Facility Build Case Study for a typical Biopharmaceutical manufacturer | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Indicative Reading List Books:
Articles: None | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Other Resources None | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||