Description This module will provide an overview of the technical and managerial challenges associated with the design and construction of a modern biopharmaceutical manufacturing facility. It will address the major components of such an exercise including site planning through conceptual and detailed design and on to commissioning, start-up and validation. A typical case study illustrating the integrated approach to facility design will also be considered. Attention will be given to the day-to-day operation of a biopharmaceutical facility operating in a regulated environment. Following facility construction, issues such as materials flow, personnel flow and some general utilities necessary for successful production will also be discussed. | |||||||||||||||||||||||||||||||||||||||||
Learning Outcomes 1. Effectively plan the major elements of an investment in a biopharmaceutical manufacturing facility. 2. Demonstrate an understanding of the complex interconnecting elements of these major capital projects. 3. Address the operational requirements for the manufacturing facility within the design. | |||||||||||||||||||||||||||||||||||||||||
All module information is indicative and subject to change. For further information,students are advised to refer to the University's Marks and Standards and Programme Specific Regulations at: http://www.dcu.ie/registry/examinations/index.shtml |
|||||||||||||||||||||||||||||||||||||||||
Indicative Content and
Learning Activities Introduction to Biomanufacturing with respect to Facility DesignFacility Design Issues – A Regulatory PerspectiveSite Selection, Conceptual Design, Site Master PlanningFacility DesignFacility ConstructionFacility Equipping, Start-up and ValidationCleanroom Design and HVAC TechnologyUtilities; Water, Gas, Steam, AirGMP Facility: day to day operation (personnel, materials & waste flows)Environmental monitoring, theory and practiceNew Facility Build Case Study for a typical Biopharmaceutical manufacturer | |||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||
Indicative Reading List
| |||||||||||||||||||||||||||||||||||||||||
Other Resources None | |||||||||||||||||||||||||||||||||||||||||
Programme or List of Programmes |
GCBE | Graduate Cert in Bioprocess Engineering |
GDBE | Graduate Dip in Bioprocess Engineering |
MSBE | Master of Science in Bioprocess Engineer |
SAMPB | STAND ALONE MODULE (BIOTECHNOLOGY) |
- See the module specification for BE587 in 2003 - 2004
- See the module specification for BE587 in 2004 - 2005
- See the module specification for BE587 in 2005 - 2006
- See the module specification for BE587 in 2006 - 2007
- See the module specification for BE587 in 2007 - 2008
- See the module specification for BE587 in 2008 - 2009
- See the module specification for BE587 in 2009 - 2010
- See the module specification for BE587 in 2010 - 2011
- See the module specification for BE587 in 2011 - 2012
- See the module specification for BE587 in 2012 - 2013
- See the module specification for BE587 in 2013 - 2014
- See the module specification for BE587 in 2014 - 2015
- See the module specification for BE587 in 2015 - 2016
- See the module specification for BE587 in 2016 - 2017
- See the module specification for BE587 in 2017 - 2018
- See the module specification for BE587 in 2018 - 2019
- See the module specification for BE587 in 2019 - 2020
- See the module specification for BE587 in 2020 - 2021
- See the module specification for BE587 in 2021 - 2022
- See the module specification for BE587 in 2022 - 2023
- See the module specification for BE587 in 2023 - 2024
- See the module specification for the current year